Breeze Block Installation & Maintenance
Geon Breeze Blocks are decorative cement blocks made for interiors: entry walls, room dividers, and screens between a vanity and a toilet or shower. They go up like masonry, one course at a time. Because every space is different, have a contractor or mason confirm your plan, especially for taller or longer walls.
Breeze Blocks are decorative, not structural. Never use them as a load-bearing wall or to support shelves, cabinets or a ceiling. Walls taller than about 8' (2.4 m) or longer than about 10' (3 m) need extra framing, posts or a header; have a contractor or engineer plan these.
Inspecting Your Shipment
Breeze Blocks are heavy but can chip at the corners and edges. Depending on how they're shipped and handled, there's always a chance a small percentage arrive damaged.
- Visible damage: As the receiver, note any visible damage on all copies of the proof of delivery (or the driver's handheld) and ask the driver for an Additional Services Form noting the damage. Take photos before the skid is unpacked, then email logistics@geontile.com with a description and photos.
- Concealed damage: Must be reported within 24 hours of delivery. Keep all packaging and email logistics@geontile.com with a description and photos.
Damage not reported within 24 hours isn't covered by freight insurance and isn't eligible for replacement. Store your blocks in a dry area and don't let the boxes get wet.
What You'll Need
- Type S masonry mortar (or a high-strength premixed mortar)
- Masonry trowel
- Pointing trowel or jointing tool
- Grout bag (optional)
- 4' level and torpedo level
- String line and line blocks
- Rubber mallet
- Wood or plastic spacers
- Rebar or threaded rod, and masonry anchors
- Large bucket and mixing paddle
- Sponges and clean water
- Gloves, eye protection and a dust mask
To cut blocks, use a wet saw or masonry saw with a diamond blade. Don't dry cut; cement dust contains silica.
Planning Your Wall
- Build on a solid, level base: a concrete slab, a properly framed and reinforced floor, or a curb. Make sure the floor can carry the full weight of the wall.
- Plan how the wall will be tied in. Breeze Block walls should be anchored to the floor and at least one adjacent wall, ceiling or post, using rebar, threaded rod or masonry ties set in the joints and through the block openings.
- Dry lay the first course with your joint spacing, typically 3/8" (10 mm), to check the layout and where cuts, ends and any doorways fall. Plan cuts so they land at the ends or top of the wall.
- Open several boxes and mix blocks as you go to blend any slight variation in colour and texture.
Setting Breeze Blocks
- Wipe or brush dust off the blocks. In dry conditions, lightly dampen them (a quick dip or mist) so they don't pull water out of the mortar. They should be damp, not wet.
- Mix mortar to a firm, buttery consistency, following the manufacturer's instructions. Only mix what you can use before it starts to set.
- Set up a string line at the height of the first course. Spread a bed of mortar about 3/8" to 1/2" thick, butter the end of each block, and press it into place. Tap gently with a rubber mallet to level.
- Keep joints consistent at about 3/8" (10 mm). Check level along each course and plumb on the face and ends every 2 to 3 courses.
- Raise the string line one course at a time and repeat. Don't build too high in one go; let the lower courses firm up so the weight doesn't squeeze out the joints.
- Reinforce as you build: run vertical rebar or threaded rod through the block openings every few blocks, anchored into the floor and the top or side framing, and add horizontal reinforcement in the mortar joints every 2 to 3 courses.
- Scrape off squeezed-out mortar before it hardens, and wipe any mortar off the faces of the blocks right away with a damp sponge. Cement blocks are porous, and dried mortar is hard to remove.
Finishing the Joints
- Once the mortar is thumbprint hard, tool the joints with a jointing tool for a clean, consistent line. If you prefer a contrasting joint, fill joints with a grout bag after the wall is built.
- Brush away crumbs with a soft brush and do a final wipe with a barely damp sponge.
- Let the mortar cure as directed by the manufacturer before hanging anything nearby or putting the wall under any stress.
Sealing, Painting or Staining
- Sealing is optional but recommended in bathrooms, kitchens and entryways. Use a penetrating sealer made for concrete or masonry to help resist stains and moisture.
- Geon Breeze Blocks can be painted or stained any colour. Wait until the mortar has fully cured (about 28 days), then use a masonry primer and a paint or stain made for concrete.
- Keep blocks out of direct water. Near a shower, place them outside the splash zone and seal them.
Maintenance: General Care
- Dust regularly with a soft brush or vacuum brush attachment.
- Clean marks with a damp cloth and a pH neutral cleaner. Never use acids, harsh chemicals or abrasive pads.
- A white, powdery film (efflorescence) can appear as new mortar dries. Brush it off when dry; if it returns, use a cleaner made for efflorescence, following its instructions.
Questions about your project? Email hello@geontile.com before you start.